Title/Location

Wible and Brundage or Oak and Brundage

Date and Start Time

2/18/2020 9:00 PM

Authorizing Dispatcher

LC

Confirming Supervisor

IA

Duration

Less than one day

Reason

Construction

Routes affected

42

Detour Description

​Construction road closed

Southbound Left on Brundage Right on Hughes Right on Terrace Way Left on Castro Right on Belle Terrace Left on Wible back on route.

Northbound Right on Belle Terrace Left on Castro Right on Terrace way Left on Hughes Left on Brundage Right on Oak st back on route.